KitLog pro

Powered By Kitlog Pro v2.0

Anthonys Web Site
' style=
Date:  4-12-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Almost finished with the riveting

Completed all the riveting, including installing the brace for the oil cooler section......except for one rivet on the front ramp. I will probably use a pop rivet for that one. I had to remove several rivets from the oil cooler doubler because they were installed with the flat side on the outside. I used pop rivets with flush heads on the inside against the engine.

I opened all the holes in the back side and back bulkhead pieces thate take 1/4 fasteners, to 17/64 per directions. I will do the same to the front sections.

While drilling out a rive the drill pushed through the rivet hole and into my finger behind it. It hit the nail and caused a tiny amount of bleeding.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.