Powered By Kitlog Pro v2.0
Toms Web Site
RV-7A
All
6-10-2009
< Previous Log Entry
Next Log Entry >
Date:
6-10-2009
Number of Hours:
1.70
Manual Reference:
Brief Description:
Fuel/vent lines
Fabricated the aluminum fuel lines and vent lines that go between the fuel tanks and the fuselage fittings for both left and right tanks.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
176
370
Empennage
8
11
Engine
15
17
Fuselage
126
302
Miscellaneous
8
16
Wings
19
24
Copyright © 2001-2024 Matronics. All Rights Reserved.