Powered By Kitlog Pro v2.0
Toms Web Site
RV-7A
All
1-21-2009
< Previous Log Entry
Next Log Entry >
Date:
1-21-2009
Number of Hours:
3.00
Manual Reference:
Brief Description:
Canopy frame drilling
Clamped canopy frame to the workbench. Drilled inner and outer attach holes for the joining strip. Cut wood blocks to space for top frame attach. Test fit partially done frame on fuselage.
Lots of clamping for the canopy frame
Wood blocks for proper spacing
Test fit for proper width
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
176
370
Empennage
8
11
Engine
15
17
Fuselage
126
302
Miscellaneous
8
16
Wings
19
24
Copyright © 2001-2024 Matronics. All Rights Reserved.