KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  1-1-2007
Number of Hours:  14.00
Manual Reference:  elevators (1)
Brief Description:  Elevators (1) from start to finish

1. We know start moving into trickier stuff. The first picture shows the skeleton layout of the supporting frame for the horizontal elevators (those things at the rear of the plane that rotate up and down to make the plane go up or down).After initially putting this all together and match drilling all holes, it's all taken apart.2. This is where I wear full chemical respirator, latex gloves and safety glasses. Three processes occur hear. All of which is designed to prevent future corrosion due to salt water/ chemicals in the air.First, alodine 33 prepares the bare aluminum metal you see in picture one. Basically, diluted prosphoric acid. Then, alodyne- a nasty chemical that bonds with the metal giving it that gold sheen. Helps prevent corrosion. You don't want it on your skin or in your lungs.Third part is Akzo two part enamel. See pictures in Elevators(2).
' style=

Initial layout of elevators

Initial layout of elevators

' style=

The Mad Scientist primer

The Mad Scientist primer

' style=

Parts w/ alodine coating

Parts w/ alodine coating

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.