Brief Description: Rudder ribs, seats and cargobay installation
Bond-prepped and cleaned the rudder and hysoled rudder ribs in place in line with vertical tail ribs. Drilled seatpan holes, installed the nutplates to attach the seatpan. Prefitted and drilled the cargobay bag and floorpanels, Had to slightly space them apart to be able to attach them. Panels to be varnished. After fitting bag and panels removed again.