KitLog pro

Powered By Kitlog Pro v2.0

BRAD'S WEB SITE
' style=
Date:  2-15-2010
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Drilled the Horizontal Stab Skin

OK, I did not follow the plans verbadem and made my life a lot harder than it should have been. I layed out both halves of the HS at once and started clecoing it together. I hope that I don't regret this someday from a wierd twist in the frame. However, the skins really helped align everything up; I wanted to use them to make sure I was doing it right. Was this a mistake? I may not know for quite a while. I am going to now take it all apart and then build on. I still have not figured out what I am going to do with my primer. I really am thinking about building a frame with chicken wire, PVC, and a prayer and just spray outside my garage door. Hopefully everything will go OK and the overspray will not be bad. Neil swears up and down that Stewart Systems Primer stays where he puts it. I just wish that my driveway did not slope so bad. I am headed to Harbor Freight this week to get a spray gun.
' style=

I wish I did not have to take this apart another two times.

I wish I did not have to take this apart another two times.

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.