This evening I began work on the left wing flap. I marked the rib locations and rivet pitch. Next I predrilled the flap skin and then installed the flap ribs. After back drilling the ribs to the final rivet size I cut the flap skin to length. Lastly I install the flap bushing and started to install the flap hinge.