Today I began work on the flaps. I marked the rib locations and the rivet pitch for the right flap. I predrilled the holes and inserted the ribs. Next I began back-drilling the front of the ribs and clecoed them in place. Next I will continue backdrilling the top and bottom of the ribs.
Laying out the Right Flap Rib Locations and Rivet Pitvh