KitLog pro

Powered By Kitlog Pro v2.0

N601MR Web Site
' style=
Date:  4-16-2004
Number of Hours:  1.50
Manual Reference:  6-T-3B
Brief Description:  Working on the Elevator

This evening I used my new angle drill to drill the two A5 holes in 6-T2-2 and 6-T2-3. Next I finished fabricating the elevator end caps and drilled and clecoed these into place. Next I finished drilling all rivet holes to their final size according to the plans. This completes the basic assembly of the elevator so now I can dissassemble, debur and apply cortex to the mating surfaces.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.