This evening I used my new angle drill to drill the two A5 holes in 6-T2-2 and 6-T2-3. Next I finished fabricating the elevator end caps and drilled and clecoed these into place. Next I finished drilling all rivet holes to their final size according to the plans. This completes the basic assembly of the elevator so now I can dissassemble, debur and apply cortex to the mating surfaces.