Brief Description: Assembly of Vertical Channels & Splice Plates to A
Positioned Fairlead blocks to Vertical Zees and Vertical Channel #5 and drilled, deburred, and revited into place. Put plastic snap bushings in 3/4" holes in both RH & LH vertical channels #2 thru #4 and put grommets in 5/16" hole in Verticals #1 thru #4 ( LH Verticals Only ). Positioned and drilled upper and lower longeron splice plates for RH and LH Aft Fuse side skins. Clecoed verticals #1 thru #5 to both RH & LH Aft Fuse side skins.