KitLog pro

Powered By Kitlog Pro v2.0

Tippin's RV-10
' style=
Date:  11-13-2011
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Finalized paint booth and dunk tanks.

Finalized the paint booth with the ventilation system. Also constructed our dunk tank which will be used to place parts in an Alumiprep bath. Also obtained a tyvek suit with a forced air system for breathing while painting in the booth.
' style=

Dunk tank.

Dunk tank.

' style=

Inisde paint booth.

Inisde paint booth.

' style=

Tyvek suit.

Tyvek suit.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.