KitLog pro

Powered By Kitlog Pro v2.0

Pete's Bearhawk Web Site
' style=
Date:  8-30-2007
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Finished drilling nose ribs and hinge doublers.

Today I finished drilling the nose ribs to the flap spars. Then I cut out the flap hinge doublers and match drilled them to the flap spars.
' style=

Clamping on the hinge doubler for drilling

Clamping on the hinge doubler for drilling

' style=

Hinge doubler match-drilled to the spar

Hinge doubler match-drilled to the spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.