KitLog pro

Powered By Kitlog Pro v2.0

Pete's Bearhawk Web Site
' style=
Date:  2-8-2009
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Positioned and drilled left nose ribs,

Today I positioned the first nose rib on the left wing. I began by measuring and marking the cord onto the spar. I then dropped a plum bob from the jig hole on the first nose rib and lined it up. I then clamped and drilled that nose rib.

Next, I strung the string from the tip rib to the nose ribs just as I did on the right wing. I then proceeded to place and drill the first 10 ribs.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.