KitLog pro

Powered By Kitlog Pro v2.0

Pete's Bearhawk Web Site
' style=
Date:  4-22-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  worked on the left aileron.

Tonight I finished drilling the gussets to the bottom of the left aileron. I also drilled out the rest of the nose ribs to #30 holes for the 1/8" rivets.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.