KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  4-19-2007
Number of Hours:  2.30
Manual Reference:  
Brief Description:  Sanding and Filing

The right top horizontal stabilizer was sanded to the point of being ready for finial finish. The rudder was extensively worked on with filing and sanding as necessary. I also rolled on a coat of Advantage primer on much of the fuselage bottom and the 2/3 of the flap bottom. I use 3 coats at least when this is done.
' style=

Right Horizontal Stabilizer Top

Right Horizontal Stabilizer Top

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.