Powered By Kitlog Pro v2.0
Davids Web Site
Barracuda
All
2-18-2008
< Previous Log Entry
Next Log Entry >
Date:
2-18-2008
Number of Hours:
1.60
Manual Reference:
Brief Description:
Installing Header Tank Lines
The inlet header tank line and the drain line were formed and installed. The inlet line has a one way Andair check valve installed. I also wrapped several ines with self healing silicone tape for extra insulation from engine compartment heat.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
625
1585
Avionics
39
78
Empennage
65
177
Engine
10
9
Fuel System
74
214
Fuselage
150
406
Interior
37
66
Landing Gear
88
232
Metal Parts
8
23
Metal Parts
2
14
Miscellaneous
17
46
None
3
8
Research / CAD
16
40
Wings
116
272
Copyright © 2001-2024 Matronics. All Rights Reserved.