Powered By Kitlog Pro v2.0
Davids Web Site
Barracuda
All
6-3-2007
< Previous Log Entry
Next Log Entry >
Date:
6-3-2007
Number of Hours:
7.50
Manual Reference:
Brief Description:
Finish Left Main Gear Door & Install
I color sanded and buffed the door exterior. THe interior was completely painted with no color sanding. I then assembled the complete left door assembly and reinstalled it on the airplane.
Left Landing Gear Doors Finnished
Interior Left Landing Gear Doors
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
625
1585
Avionics
39
78
Empennage
65
177
Engine
10
9
Fuel System
74
214
Fuselage
150
406
Interior
37
66
Landing Gear
88
232
Metal Parts
8
23
Metal Parts
2
14
Miscellaneous
17
46
None
3
8
Research / CAD
16
40
Wings
116
272
Copyright © 2001-2024 Matronics. All Rights Reserved.