Powered By Kitlog Pro v2.0
Build Log
RV-9
All
9-17-2012
< Previous Log Entry
Next Log Entry >
Date:
9-17-2012
Number of Hours:
1.00
Manual Reference:
Brief Description:
Drilled holes for GADAHRS brace
Drilled holes through upper end of the GADAHRS brace and the J-channels of the top deck.
GADAHRS shelf with brace
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.