Powered By Kitlog Pro v2.0
Build Log
RV-9
All
8-15-2012
< Previous Log Entry
Next Log Entry >
Date:
8-15-2012
Number of Hours:
5.00
Manual Reference:
Brief Description:
Fuselage Static System
Started on the fuselage static system.
Installed a water trap at the lowest point and a backup internal static source (with a defined orifice), based on the static system of the DA40.
Static lines
Static lines coming forward
Water trap
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.