Powered By Kitlog Pro v2.0
Build Log
RV-9
All
5-26-2012
< Previous Log Entry
Next Log Entry >
Date:
5-26-2012
Number of Hours:
5.00
Manual Reference:
DWG38; Manual 8-15
Brief Description:
(Temporarily) installed control system
Temporarily installed control system.
Cut, drilled and deburred F-790 and F-989 pushrod assemblies.
Control system
Detail of control system
Parts of F-790 and F-989
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.