KitLog pro

Powered By Kitlog Pro v2.0

Build Log
' style=
Date:  5-13-2012
Number of Hours:  6.00
Manual Reference:  DWG33; Manual 8-13
Brief Description:  Continued work on the electric flap

Notched all floor coverings that would interfere with the centre flap bearing block F-680.
Drilled tunnel cover F-741B to tunnel cover support F-741A.
Enlarged all holes for the rudder cables to 5/8".
' style=

Flap actuator temporarily installed

Flap actuator temporarily installed

' style=

Tunnel cover

Tunnel cover

' style=

3/8

3/8" holes for rudder cables

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.