Powered By Kitlog Pro v2.0
Build Log
RV-9
All
2-2-2012
< Previous Log Entry
Next Log Entry >
Date:
2-2-2012
Number of Hours:
1.00
Manual Reference:
OP-42
Brief Description:
Drilled strobe/ELT bracket
Drilled strobe/ELT brackets (left and right) to J-channels of the fuselage.
Deburred all holes, including holes for nutplates on left side for ELT installation.
Bracket in place on RH side
Holes in J-channels on right side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.