Powered By Kitlog Pro v2.0
Build Log
RV-9
All
3-14-2011
< Previous Log Entry
Next Log Entry >
Date:
3-14-2011
Number of Hours:
2.00
Manual Reference:
DWG 5; Manual 6-6
Brief Description:
Fabricated elevator stiffeners
No joy on the replacement part for the pneumatic squeezer.
Cut, sanded and deburred the elevator stiffeners (E-908-L, E-908R and E-909). Very repetetive work. Except for matchdrilling, the stiffeners are done.
Next: Continue with elevator or rivetting rudder.
Finished elevator stiffeners
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.