Drilled and rivetted centre hinge bearing to the hinge bracket. Bolted the hinge bracket to the rear HS spar. Torqued with 2,7Nm (not much torque, a bit surprising).
Finished the HS (sort of, the glass tips are still to go, will do all glass parts of the empennage at once at the end of the empennage construction period).