KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
' style=
Date:  8-9-2015
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Wash and prime vertical stab. Insall new hinges.

Again on the side of the house to degrease and acid washing a skin. This time its the vertical stab. Then prime both the vertical stab skeleton and inside of the skin. Now is the time to rivet on the brand new vertical stab hinges.
' style=

degrease and acid washing.

degrease and acid washing.

' style=

Prime vertical stab.

Prime vertical stab.

' style=

Rivet on new hinges.

Rivet on new hinges.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.