Brief Description: Wash and prime vertical stab. Insall new hinges.
Again on the side of the house to degrease and acid washing a skin. This time its the vertical stab. Then prime both the vertical stab skeleton and inside of the skin. Now is the time to rivet on the brand new vertical stab hinges.