Brief Description: Final Drill and Dimpling HS skin and substructure
The right HS skin was completed with the final drilling. The right HS and substructure were dimpled in preparation for riveting. The air compressor failed to close off when the compressor had reached the top pressure setting, releasing all the air. It was sent out for repair.