KitLog pro

Powered By Kitlog Pro v2.0

Thomas's RV7
' style=
Date:  9-26-2021
Number of Hours:  3.40
Manual Reference:  
Brief Description:  

Match drilled the bottom of the right aileron. Drilled the holes in the counterballance pipe on the right aileron to #40 then up to #30. Clecoed the left aileron skeleton together an d match drilled the ribs to spar. Clecoed left aileron together with the counterballance pipe. Match drilled holeds in the left aileron skin.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.