Finished riveting ribs to the right leading edge skin. Deburred and riveted nutplates onto right Z brackets. Riveted nutplates to right spar for the inboard Z bracket. Installed bushings for vent line in right fuel tank. Cut and fit fuel vent line. Saftey wired flip flop tube onto the bulkhead fitting and temporarily installed to check fit.