KitLog pro

Powered By Kitlog Pro v2.0

Thomas's RV7
' style=
Date:  11-11-2020
Number of Hours:  1.30
Manual Reference:  
Brief Description:  

Fabricated the second anti hangup guide for the right fuel tank. Match drilled to the rib and stiffener. Drilled the vent line hole in T-703-L to #30 then up to 7/16. Cleaned up the hole. Cut a plate to block off the center hole in the second rib. Match drilled, deburred and dimpled.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.