Marked remainin F705J. Drilled holes. Clamped in place with 125 bar for spacer and drilled. Clecoed F705D+E together. Clecoed bulkhead together and match drilled. Drilled holes in F705D up to 5/8 for the snap bushings. Scuffed up some of the parts in prep for priming.