Powered By Kitlog Pro v2.0
Tobias' Web Site
RV14A
All
6-15-2018
< Previous Log Entry
Next Log Entry >
Date:
6-15-2018
Number of Hours:
4.00
Manual Reference:
07-04 to 07-07
Brief Description:
Final drilling the rudder
Printed the horizontal stabilizer jigs
Built the rudder skeleton with clecos
Match / Final drilled the doublers
Final drilled the skin where required
Finished the skeleton
Final drilled everything required
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV14A Home
Category
# Logs
# Hours
All
59
312
Empennage
48
180
Miscellaneous
1
10
Wings
10
122
Copyright © 2001-2024 Matronics. All Rights Reserved.