KitLog pro

Powered By Kitlog Pro v2.0

Tobias' Web Site
' style=
Date:  6-4-2018
Number of Hours:  1.00
Manual Reference:  06-02
Brief Description:  Vertical Stabilizer Forward Spar

Finished step one through five of the forward spar.
- Match Drilled the doubler to the spar
- Modified the doubler as stated in the manual
- Deburred all non prepunched holes (in the RV 14, you only have to deburr holes you made or if it states deburring in the manual)
- Deburred all metal edges and rounded corners
I will postpone steps 6 and 7 so that I can batch prime the parts.
' style=

FW Spar rdy for prime prep

FW Spar rdy for prime prep

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.