Powered By Kitlog Pro v2.0
Sonex #1598 Build Log
Sonex
Empennage
7-5-2016
< Previous Log Entry
Next Log Entry >
Date:
7-5-2016
Number of Hours:
1.75
Manual Reference:
SNX-T02
Brief Description:
Elevator/stabilizer hinge attachment
I was able to get the elevator/stabilizer hinge drilled and cleco'ed tonight. It is all ready for riveting.
Placing and drilling the horizontal stab to elevator hinge half.
I hope I don't drill my finger!
Hinge half all ready for riveting.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Home
Category
# Logs
# Hours
All
164
489
Angle Parts
37
125
Empennage
33
93
Miscellaneous
3
22
Paint/Finish/Polish
3
9
Storage
3
14
Wings
84
223
Workshop
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.