KitLog pro

Powered By Kitlog Pro v2.0

Sonex #1598 Build Log
' style=
Date:  3-26-2015
Number of Hours:  1.50
Manual Reference:  SNX-T08
Brief Description:  Finished the Vertical Stabilizer!

I finished the vertical stabilizer, SNX-T08-01, today. This went fairly smoothly. I only had to drill out two rivets. One rivet did not set flush and the other had some kind of corrosion problem that caused part of the rivet to fall apart. I re-did it just to be safe.

I will start on the elevators next. I also need to figure out a way to store the empannage in the garage/shop. I will probably figure out some way to hang the parts from the wall or ceiling. I will also do the preliminary polishing of the skins, too. Can't wait!
' style=

Stabilizer loaded with rivets and ready for riveting.

Stabilizer loaded with rivets and ready for riveting.

' style=

Making sure that the rivets go in straight and flush to the surface.

Making sure that the rivets go in straight and flush to the surface.

' style=

Finished stabilizer. Now I need to find a storage space for it.

Finished stabilizer. Now I need to find a storage space for it.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.