KitLog pro

Powered By Kitlog Pro v2.0

Bird
' style=
Date:  3-22-2014
Number of Hours:  6.00
Manual Reference:  N/A
Brief Description:  control cables

Installed cables onto quadrant. Installed firewall penetrations for cables, throttle, mixture, carb heat and propellar. Fabricated and installed carburetor heat control onto quadrant. Installed quadrant into fuselage. Completed wiring for up/down elevator trim on throttle handle and to vpx. Tested, ok.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.