Riveted the upper and lower forward baggage bulkhead onto fuselage. Painted the aft baggage compartment area and floor board. Riveted aft baggage floor. Fabricated flap pushrods. Installed flap actuator and bearing blocks. Installed the flap pushrods and ran the motor both directions to check for proper movement and clearances. Ok, no binding. Flap system ready for final wiring and rigging.