Leveled the fuselage, laterally and longitudally. Bolted gear with one bolt ea. Installed angles on gear and dropped plumb bobs on them and on fwd and aft fuselage. Popped lines on floor for fuselage. Began measuring and adjusting gear legs and measuring.