Powered By Kitlog Pro v2.0
Bird
RV8
Fuselage
10-5-2011
< Previous Log Entry
Next Log Entry >
Date:
10-5-2011
Number of Hours:
2.00
Manual Reference:
Pg.,30,DWG67-72
Brief Description:
final assembly preparation
Finished dissassembly down to firewall and floor board that was previously riveted. Countersunk holes in lower fwd. L/H longeron and auxillary L/H longeron.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
516
1739
Avionics/electrical
37
105
Empennage
63
244
Fuel tanks
19
80
Fuselage
225
643
Miscellaneous
12
27
Paint
59
224
Tools
1
2
Wings
100
414
Copyright © 2001-2024 Matronics. All Rights Reserved.