KitLog pro

Powered By Kitlog Pro v2.0

Bird
' style=
Date:  6-17-2011
Number of Hours:  6.00
Manual Reference:  Pg.7-10,DWG.13A
Brief Description:  ailerons

Completed riveting R/H aileron. Installed brackets and torqued. R/H aileron completed. Inspected right and left ailerons. OK. Began studying flap dwg. and manual. Removed blue plastic and sorted all parts for both flaps. Began breaking edges of L/H flap skins and ribs.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.