KitLog pro

Powered By Kitlog Pro v2.0

Bird
' style=
Date:  1-2-2012
Number of Hours:  8.00
Manual Reference:  Pg.8-51,4 DWG 78
Brief Description:  Empannage rigging

Fitted the elevator stops. Adjusted elevator throw for 30 degrees up and 25 degrees down. Final checked for proper clearances throughout range of movement. Installed vertical stabilizer and rudder. Fitted rudder stops. Installed rudder cables and rudder pedals. Connected rudder cables to rudder. Adjusted as per plans to give 1 inch of clearance from elevators at full throw in both directions. Adjusted attachments to rudder pedals to suit me. Checked for proper clearances on all rudder parts.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.