KitLog pro

Powered By Kitlog Pro v2.0

Bird
' style=
Date:  1-22-2012
Number of Hours:  2.00
Manual Reference:  Pg.8-65 Dwg. 83
Brief Description:  Brake lines

Finished fitting the baggage door, and installed the door lock and fitted to latch blocks. Installed brake fittings under baggage bulkhead and below gear box. Fabricated L/H and R/H brake lines and installed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.