Powered By Kitlog Pro v2.0
Bird
RV8
All
9-13-2011
< Previous Log Entry
Next Log Entry >
Date:
9-13-2011
Number of Hours:
6.00
Manual Reference:
Pg.,21-2318 DWG 70
Brief Description:
aft fuselage bulkheads
Fitted and riveted 810 bulkhead. Prepared all parts for 809,808 and 807 bulkheads. Drilled and deburred all parts. Riveted L/H and R/H bulkhead parts for each bulkhead together after priming. Prepared aft baggage ribs and stiffeners and angles.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
516
1739
Avionics/electrical
37
105
Empennage
63
244
Fuel tanks
19
80
Fuselage
225
643
Miscellaneous
12
27
Paint
59
224
Tools
1
2
Wings
100
414
Copyright © 2001-2024 Matronics. All Rights Reserved.