Decided to build a wing cradle today, so the L/H wing can be moved and stored out of the shop. This will allow the beginning of construction of the R/H wing! Crate built and wing moved onto it today. Began assembling R/H wing. Work up to assembling spars and ribs have been done when the L/H wing was prepared. Fitted ribs double checked locations and flange directions.