Completed riveting R/H aileron. Installed brackets and torqued. R/H aileron completed. Inspected right and left ailerons. OK. Began studying flap dwg. and manual. Removed blue plastic and sorted all parts for both flaps. Began breaking edges of L/H flap skins and ribs.