KitLog pro

Powered By Kitlog Pro v2.0

Seans Rv8
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-6-2014
Number of Hours:  3.00
Manual Reference:  7/2
Brief Description:  Tie Down Bracket and Rear Spar

Got my new tie down bracket in, and now time to do it right!!! After I back drilled all of the holes in the Bracket and Spacers I scuffed and cleaned everything and shot them in primer.

While the primer was drying I scuffed all of the rear spar parts and hung them up....the weather is going to be warmer tomorrow so hopefully I will be able to give it a good wipe down with some camp fuel and shoot them with some DLP50.

After the primer dried on the tie down brackets I Counter sunk the back of the spacers to accept the 3-7 rivets and then riveted the bracket, spacers and platenuts together.
' style=

Drilling Plate Nut Holes

Drilling Plate Nut Holes

' style=

Both Tie Down Brackets Done

Both Tie Down Brackets Done

' style=

All of the Rear Spar parts Scuffed and ready to be Cleaned and Primed

All of the Rear Spar parts Scuffed and ready to be Cleaned and Primed

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.