Brief Description: Started match drilling Left understructure and riv
Today I had some time to work before the Christmas Holidays. I started off by match drilling all of the understructure frame work. I then realized a slight oversight on my part. I didnt see anywhere in the instructions where it said anything about drilling, dimpling and riveting on the nutplates on the 616 trim access door and doubler plate. I had already riveted on the doubler, so I had to use the DRDT to set the -3 rivets on the nutplates. I saw on Brent Owens build log where he did this same thing and it worked out great.
Match drilling under structure
Found it easier to use 12" bit to drill these holes