KitLog pro

Powered By Kitlog Pro v2.0

Seans Rv8
' style=
Date:  12-7-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Match Drilled and some dimpling and counter sinkin

Has a great day in the shop. Im still not satisfied with the trailing edge of the right elevator, but for now I think I will leave it alone.

I match drilled the skin onto the under structure....pretty straight forward. I unclecoed all of the skings and dimpled the 713 skin to a #10 dimple for the screws that hold the counter weight on. I then installed my #10 counter sink bit into the drill press and counter sunk the counter weight.

I tried to use my counter sink cage on the 4 holes on 702 spar, but the flanges were in the way. I ended up taking the #40 counter sink bit out and installing it in the deburing handle and gave it about 3 -5 turnd and use a -3 rivet to check the counter sink.....once I got close i only used about 1-2 turns at a time.

I finished off the day by deburing and dimpling the 713 counter weight skin.

All in all it was a much more relaxing day that yesterday with the trailing edge bend.....still trying to figure out how I want to tweak my bend.
' style=

Match drilling the skins

Match drilling the skins

' style=

I had to install my counter sink bit in my deburing tool

I had to install my counter sink bit in my deburing tool

' style=

using the drill press to counter sink the counter weight

using the drill press to counter sink the counter weight

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.