KitLog pro

Powered By Kitlog Pro v2.0

Marks Rans Courier Project
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-11-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Rebuild construction bench/table

My workbench was getting a little thrashed and the top was not even, and beyond simple sanding to re-surface. I removed the top and installed a new MDF top, then applied a polyurethane finish to the surface.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.