KitLog pro

Powered By Kitlog Pro v2.0

Marks Rans Courier Project
' style=
Date:  4-28-2009
Number of Hours:  3.00
Manual Reference:  
Brief Description:  painting control surfaces

It is time to install the ailerons and flaps. As I began the work, I did not like the quality of the paint finish on the parts. The paint just did not look good, with too much debris in the final coat (a hazard of painting next to a horse arena in a make-shift paint booth).

I sanded all four of the wing control surface parts, then applied a cross-coat of finish paint. I applied a second cross-coat an hour later.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.