Powered By Kitlog Pro v2.0
TAB Aircraft LLC Web Site
Searey LSX
All
3-12-2014
< Previous Log Entry
Next Log Entry >
Date:
3-12-2014
Number of Hours:
2.00
Manual Reference:
S32- 16.1 to 18.2
Brief Description:
Page 482 Finishing up the Right Canopy
March 14 2014 continued.
Finishing up the Right Canopy
Measured and drilled the rivet holes in the Guides and Braces on the Right Side Canopy
Removed the Lexan and masked and painted the inside of the edges. I also painted some of the rivets black that will go on the Braces.
Reinstalled the Lexan and riveted to the Guilds and Braces
Installed the Knobs and the bolt at the end of the track.
This one slides good and seals against the front and rear weatherseals.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Searey LSX Home
Category
# Logs
# Hours
All
546
800
Aircraft
7
2
Airframe
58
113
Avionics
45
86
Background
20
1
Brakes
5
4
Cockpit
67
130
Education
17
2
Engine
38
28
Exterior Trim
24
25
Fly-In/Party
7
Fuselage
5
9
Gear Assembly
21
22
Hull
12
19
Interior Trim
27
38
Miscellaneous
22
2
Modifications
42
72
None
1
Prop
5
4
Turtle Deck
16
32
Wings
42
80
Wiring
53
131
Work Shop/Hanger
12
Copyright © 2001-2024 Matronics. All Rights Reserved.